40TH PRECINCT
NYCDDC 2003
The police precinct building in Staten Island, NY is structural steel framing with concrete and metal deck floors. Work included energy and cost feasibility studies and a LEED evaluation. Energy reductions were over 20%, with an annual energy savings of $16,000/yr and a payback of 3.7 years.